200kW Installation

Austeco are very pleased to update with news of a planned 200 kW Installation near Port Macquarie.

20160208_150333.jpg

Initially during phase 1 there will be one then two 20 – 25 kW Powerpaks utilising virgin cellulose.

Phase 2 is planned as a 150 kW Powertainer

The energy produced will be grid connected.

There are plans for CHP utilisation as part of this project as well.

There is considerable R&D involved in this installation which will be a first in Australia.

For more information, or if you have any questions please get in touch.

APL and Austeco  is now re-releasing a new, improved small scale GEK Gasifier.

This is a much more advanced version of the former GEK-Level IV and uses the latest V5 steel ceramic hearth, among many other features.

You can think of the new GEK Gasifier as a Power Pallet without the engine or the generator, but including the same Process Control Unit and sensors used in a Power Pallet.

Customers will be able to use this product to produce clean syngas from our approved fuel list (currently wood chips, walnut shells, and coconut shells) and to test the suitability of other biomass types as potential fuel.

 Austeco has Innovative Australian Made genets from 5 to 8 kW that can suit this application.

Get in touch for arrange more information on this option, including via testing of other fuel types.